Considering the small size of the parcels in the area, the narrow and difficult access of routes, the steep topographic slope (ranging between 15% and 35%), the presence of rocky ground in certain parts, and the unsuitability of the land structure for pipe excavation, the project planned the installation of different diameter pipes: 20,802 meters of Ø150 mm steel pipe and 2,220 meters of Ø250 mm steel pipe, totaling 23,022 meters of steel pipelines. Water transmission and controlled water distribution were ensured through a digital prepaid card system.

 

With the contribution of 23,841,630.20 ₺ from the KOP Regional Development Administration, the project was completed, enabling irrigation of 155 hectares with a closed system and transition to pressurized irrigation systems, thereby supporting the agricultural activities of 700 farming families. In addition, the project resulted in an annual Crop Production Value of approximately 15,078,329 ₺.